Оператор ТУ (Эксплуатация Скважин )
Описание
                  Askar Bisekeshov 
                                                            Tel 8 705 512 71 71
                                                                8 702 920 70 43
 Work Experience
  2022  -  Present  Mechanical Technician 1[st] category
 Republic of Kazakhstan, Tengiz, FGP Third Generation Project (3GP).
 Description of works: Pre-Commissioning and commissioning of air compressors, pressure supply to the instrumentation line as well as Plant air. Start of the centrifugal pump for the supply of raw water, Process water.
 Commissioning of fire water on all sections of the plant, inspection of all lines and elimination of leaks and inspection of fire hydrants and hoses. Running-in without loading of electric motors (Solo run test), filling out checklists for temperature and vibration data, submitting reports to customers for closing C1, after performing the alignment of the pumps and installing (shafts or belts between the electric motor and the pump) to perform running-in under load for closing and commissioning the document C2(Load runt test ). Commissioning of conveyors  -  centering of the belt, rollers, scales, measuring the distance
 between the rollers after entering the data into the matrix, then based on the data, centering the belt along the axis, running-in without load and under load for commissioning. Commissioning of Oil stations and Hydraulic equipment for commissioning. Conducting tests on crane beams and chain winches of static and dynamometric testing for transmission in operation. Setting up and commissioning of Air Handling unit. As well as related mechanical work.
  
  2021 - 2022  Pre-Commissioning Mechanical
 Republic of Kazakhstan, Aktogay Expansion Project.
 Description of works: Pre-Commissioning and commissioning of air compressors, pressure supply to the instrumentation line as well as Plant air. Start of the centrifugal pump for the supply of raw water, Process water.
 Commissioning of fire water on all sections of the plant, inspection of all lines and elimination of leaks and inspection of fire hydrants and hoses. Running-in without loading of electric motors (Solo run test), filling out checklists for temperature and vibration data, submitting reports to customers for closing C1, after performing the alignment of the pumps and installing (shafts or belts between the electric motor and the pump) to perform running-in under load for closing and commissioning the document C2(Load runt test ). Commissioning of conveyors  -  centering of the belt, rollers, scales, measuring the distance
 between the rollers after entering the data into the matrix, then based on the data, centering the belt along the axis, running-in without load and under load for commissioning. Commissioning of Oil stations and Hydraulic equipment for commissioning. Conducting tests on crane beams and chain winches of static and dynamometric testing for transmission in operation. Setting up and commissioning of Air Handling unit. As well as related mechanical work.
 26.11.2020  in  30.04.2021 (KPO) construction 4[th] injection compressor project
             Position: Technical mechanic of rotating Duties:
  Turbine and compressor alignment Rotor alignment Fan radiator cooling.
 05.06.2018  Sakhalin energy 30.09.2018 Position: Multi skill 
                     technician
             Duties:
 Shut down, Purging, Leak testing, Nitrogen Pumping, Decanting N2 Tanks
 5.05.2017 "KCOI" LLP (Kashagan) in Agip ICOC-PSN KAZSRTOI project.
             Position: the Mechanic on equipment maintenance Duties:
Overhaul of collector wells, valve replacement high pressure. Complete replacement of oil and gas lines, replacement of pumps, maintenance and repair of generators.
 15.06.2016 "Ozen Port Production Base"LLP- (karabatan) in NCOC construction 11.05.2015 Project Position: Foreman for mechanical works.
            Duties:
 Installation of pumps, fittings and flange connections. Hangar of metal structures, installation of a conveyor station for loading sulfur, centering the drum, electric motor with a gearbox, mobile conveyor for loading sulfur.
 09.05.2011 Wetheford" LLP- (karabatan) in Agip KCO project
            30.03.2015  Position: Technic-Mechanic, Operator-Mechanic on high pressure equipment.
            Duties:
 Leakage test, hydrotest of lines (nitrogen) and commissioning. Purification of the amino acid solution.
 Maintenance and repair of high-pressure diesel compressors with rotating equipment and equipment for nitrogen processing.
 Punch list/Line up process systems as per marked up P&ID. Carry out Air/N2/He Leak test.
            
19 февраля, 2018
Наталья
Город
Уральск
Возраст
59 лет (23 сентября 1966)
25 марта, 2018
Толеген
Город
Уральск
Возраст
55 лет (31 октября 2025)
5 июня, 2018
Ислам
Город
Уральск
Возраст
55 лет (31 октября 2025)